Smoke and heat extraction -

Priority switch

Priority switch

Schakelaar prior smoke vent aangepast 2020

SHEV control switch

  • Developed for Skycom CE
  • Highest priority in the system
  • LED display when opening and closing

A priority switch has the highest priority in the smoke and heat extraction system. This switch is not provided as standard with the Skycom CE Master control unit and is sometimes additionally provided for the fire brigade.

Specifications and documents

A tool for firefighters

If, for any reason, the Skycom CE central control unit cannot be located near the entrance door (the firefighters’ access route) to the building, this switch should be provided. The presence of a priority switch at the entrance door allows the fire brigade to easily operate the SHEV system. 

In such a case, the Skycom CE control unit might for example be installed in the technical space or further inside the building.

Schermafbeelding 2023 09 21 om 14 37 46

documents and specifications

Consult all the documentation and technical information on this smoke and heat extraction system here so that you can make the right choices for your project.

specifications

Type

switch

Dimensions (w x h x d)

125 mm x 125 mm x 36 mm

Safety first Quote